This CNC machinery import project required continuous coordination between customs procedures, inland transport and the lifting method at destination. The shipment used one 20FR and one 20DC.
▶ Watch the 75-second Project 09 case-study video
SeaAir's scope
- customs declaration and inspection coordination;
- survey coordination for the shipment's required certification;
- inland transport from port to factory;
- unpacking, condition checks and path preparation;
- forklift, personnel and support-equipment coordination for final positioning.
The challenge: large machinery, limited space
The most demanding stage came at destination. The machine was large while forklift turning room and working clearances were limited. The method had to consider the centre of gravity, access points, clearances and direction of travel as one system.
Site execution
Before removing the machinery from its case, the team checked its condition, packing base and movement path. The forklift approached according to the agreed method while spotters monitored blind areas and safe clearances. Inside the production area, the machine was turned and shifted in controlled steps to match the actual available space.
Why an integrated plan matters
When customs, trucking and unloading are planned separately, cargo can wait for equipment or require a last-minute method change. One coordinated workflow connects import documentation with delivery planning and the real conditions at the factory.
The machinery was moved through the constrained area and placed in the production position according to the prepared method.
For machinery imports, request a quote with photos, drawings, dimensions, weight, lifting points, pickup/delivery addresses and the required timeline so SeaAir can review a suitable plan.
Challenge
The shipment used one 20FR and one 20DC. The main challenge was not only import clearance, but also moving large machinery through a constrained warehouse while controlling the centre of gravity, clearances and direction of travel.
SeaAir solution
SeaAir coordinated customs declaration, inspection and survey requirements; arranged inland delivery from the port; checked condition before unpacking; and sequenced forklifts and personnel to remove the machine from its base and position it inside the production area.
Result
The machinery was moved through the constrained work area and positioned in the production zone according to the prepared method. The project demonstrates the value of one coordinated workflow from customs and transport to unloading and handover.